The California ISO's change management process facilitates the transparent exchange of ideas and information when the ISO considers modifications to its Business Practice Manuals (BPMs). Use this site to submit and view Proposed Revision Requests (PRRs) and their statuses and to access the BPM library.


  • The purpose of BPMs is to set forth business practices that implement the ISO tariff. The ISO conducts a yearly policy initiative roadmap process to consider and rank initiatives.
  • Policy changes submitted though the PRR process will be referred to the policy initiative road map process.  Each subject area in a BPM is based on enabling language in the ISO tariff.
  • The PRR process cannot be used to introduce changes that are not supported by existing tariff authority.
PRR Title Filter
  • All the columns can be Sorted/Filtered except for the 'Comments' column.
  • Click on the PRR Number to view the complete details of the PRR.
  • To view the complete title mouse hover on the PRR Title field.
  • IC - Initial Comment, RC - Recommendation Comment

  • PRR
    PRR Title
    BPM
    Status
    Category
    Submitted By
    Priority
    Last Action
    Comments
    .........
    1073This is my Second PRRCompliance MonitoringInitial CommentAMunusamy, Sudakar (CAISO)Normal8/8/2018 IC: 0
    RC: 0
    1072Test PRR TitleBPM Change ManagementInitial CommentCMunusamy, Sudakar (CAISO)Emergency8/8/2018 IC: 0
    RC: 0
    1071Changes related to dispatch operating target tariff clarificationMarket OperationsInitial CommentCBatakji, Jamal (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1070Monthly gas prices for demand response net benifits testMarket InstrumentsInitial CommentCBatakji, Jamal (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1069Remove all references to the conceptual statewide planTransmission Planning ProcessInitial CommentCDeShazo, Gary (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1068EIM area flow constraint definitionEnergy Imbalance MarketInitial CommentABatakji, Jamal (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1067Generator modeling data requirementTransmission Planning ProcessRecommendation CommentBBillinton, Jeffrey (CAISO)Normal7/2/2018 IC: 2
    RC: 0
    1066Approved project sponsor report requirementTransmission Planning ProcessRecommendation CommentBBillinton, Jeffrey (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1065Registration cost monthly validation process updateMarket InstrumentsRecommendation CommentABatakji, Jamal (CAISO)Normal7/2/2018 IC: 1
    RC: 0
    1064Energy storage and distributed energy resources updatesMeteringRecommendation CommentANamburi, Priyanka (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1063Modification to section 6 to include additional net qualifying capacity languageReliability RequirementsRecommendation CommentAKatta, Gautham (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1062Revised and combined scheduling coordinator training and testing sectionsScheduling Coordinator Certification and TerminationRecommendation CommentAPayton, Julia (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1061Resource Interconnection Management System and Miscellaneous Updates Managing Full Network ModelRecommendation CommentBLiang, Vivian (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1060Updated BPM configuration guide for pre-calculation resource adequacy availability incentive mechanism to accommodate demand response auction mechanism resource adequacy waivers and non-resource specific system resource adequacy exemptionsSettlements and BillingRecommendation CommentBPeacock, Bonnie (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1059Changes due to congestion revenue rightsOutage ManagementRecommendation CommentCKatta, Gautham (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1058Updated BPM configuration guide for pre-calculation resource adequacy availability incentive mechanism to accommodate generator availability resource adequacy issue Settlements and BillingFinal DecisionBKwong, Jennifer (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1057Updated sections with reference to reliability inbox with customer inquiry and dispute interface (CIDI) and added availability assessment hours for 2019Reliability RequirementsFinal DecisionAWoody, Kyle (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1056Clarifications to existing generator retirement processes including public postingGenerator ManagementFinal DecisionABradley, Joanne (CAISO)Normal7/2/2018 IC: 1
    RC: 0
    1055Update the pre-calculation metered subsystem deviation penalty quantity configuration to properly account for MSS instructed imbalance energy for a MSS load following resource with no day ahead award but dispatched in real time marketSettlements and BillingFinal DecisionBKwong, Jennifer (CAISO)Normal7/2/2018 IC: 2
    RC: 0
    1054Real-Time communications optionsDirect TelemetryFinal DecisionANamburi, Priyanka (CAISO)Normal7/2/2018 IC: 0
    RC: 0
    1053Flexible ramping requirements clarificationMarket OperationsFinal DecisionABatakji, Jamal (CAISO)Emergency7/2/2018 IC: 0
    RC: 0
    1052Process of addressing market issuesMarket OperationsClosedBBatakji, Jamal (CAISO)Normal6/14/2018 IC: 0
    RC: 0
    1051Flexible ramping clarificationEnergy Imbalance MarketClosedABatakji, Jamal (CAISO)Emergency6/14/2018 IC: 0
    RC: 0
    1050Process for adding energy storage between the Phase I and Phase II studiesGenerator Interconnection and Deliverability Allocation ProceduresWithdrawnAWright, Linda (CAISO)Normal6/14/2018 IC: 0
    RC: 0
    1049Update to charge codes 3303, 6470, 6482, and 6488 to correct the locational marginal pricing used to settle exceptional dispatch energy for metered subsystem net resourcesSettlements and BillingClosedBPeacock, Bonnie (CAISO)Emergency5/16/2018 IC: 0
    RC: 0
    Total No. of Proposed Revision Requests = 1021
    1 - 25 Next